%0 Journal Article %T IN-SERVICE REMEDIATION OF A RAILWAY EMBANKMENT TO PREVENT SETTLEMENT %A Jan Grepl %J - %D 2019 %X After optimization of the railway geometry for higher speed, a continuous settlement of the track occurred. Improvement of the embankment body was needed; however, a complete traffic interruption was not allowed. The reconstruction work has been done using the methods of special ground engineering such as vibro-stone columns and driven ductile piles %K railway embankment settlement %K vibro-stone columns %K ductile piles %U https://ojs.cvut.cz/ojs/index.php/APP/article/view/5693