%0 Journal Article %T 浅析油气管道站场和井口的混凝土基础施工
Analysis of Concrete Foundation Construction for Oil and Gas Pipe Plants and Wellheads %A 梁立国 %A 高英明 %A 刘铁军 %J Journal of Oil and Gas Technology %P 145-153 %@ 2471-7207 %D 2020 %I Hans Publishing %R 10.12677/JOGT.2020.424125 %X 国内和国际石油化工行业的快速发展,催生了大批油气管道站场和井口的新建、改建和扩建项目。本文结合国内外项目的施工经验,分析场站内混凝土基础的施工技术要求,从钢筋绑扎、模板支护以及浇筑等方面阐述了各个工序的施工要点和质量要求。
With the fast development of domestic and international oil and gas industry, a huge number of projects for oil and gas pipe plants and wellheads, are newly built, renewed or expended, and de-veloped. And this article, covering the experience learned from either the domestic projects or the overseas, analyzes the technical requirement of the concrete foundations constructed either in plants or at wellheads, and also illustrates the keys and quality requirement for the construction processes including rebar binding, formwork supporting and concrete casting. %K 钢筋混凝土,钢筋绑扎,模板支护,基础安装
Reinforced Concrete %K Rebar Binding %K Formwork Supporting %K Foundation Installation %U http://www.hanspub.org/journal/PaperInformation.aspx?PaperID=40189