%0 Journal Article
%T 长钢高炉提高焦炭负荷冶炼生产实践
Practice of Increasing Coke Load Smelting in Blast Furnace of Changgang
%A 王继萍
%J Metallurgical Engineering
%P 219-223
%@ 2373-1486
%D 2020
%I Hans Publishing
%R 10.12677/MEng.2020.74030
%X
2019年以来长钢8号9号高炉经过提高负荷攻关活动,高炉焦炭负荷由4.3提高到4.9,燃料成本扭亏为赢。其提高焦炭负荷的主要措施有:精料、提高热风温度、中心加焦、提高富氧率、搞好上下部调剂,稳定炉况和加强管理,推行标准化操作等。
Since 2019, the coke load of No. 8 - 9 BF of Changgang was increased from 4.3 to 4.9 after the load improvement, and the fuel cost turned to win. The main measures to improve coke load include: fine material, raising hot air temperature, coke adding in center, increasing oxygen enrichment rate, adjusting the upper and lower parts, stabilizing furnace condition, strengthening management, and carrying out standardized operation.
%K 高炉,负荷,措施
Blast Furnace
%K Load
%K Measures