%0 Journal Article %T Delays in the Pre-Construction Phase of State Sector Building Projects %J Engineer: Journal of the Institution of Engineers, Sri Lanka %D 2009 %R 10.4038/engineer.v42i3.7049 %X Senior Lecturer, Department of Civil Engineering, Eng., CEng, FlE(Sri Lanka), BSc Eng. (Moratuwa), MSc (Reading), MA (Colombo), MBA (SJP) Director Projects, Eng. Captain, CEng, MIE (Sri Lanka), BSc Eng. (Moratuwa), MTech (OUSL %K Pre-Construction Phase %K Construction Industry %K Causes of Delays %U https://engineer.sljol.info/articles/10.4038/engineer.v42i3.7049/