%0 Journal Article %T 新建铁路隧道上跨既有公路隧道控制爆破安全距离研究<br>Analysis on control blasting safety distance of the new railway tunnel overpasses the established highway tunnel %A 赵丰 %A %A 薛亚东 %A %A 李硕标 %A %A 赵瀚翔 %A < %A br> %A ZHAO Feng %A %A XUE Yadong %A %A LI Shuobiao %A %A ZHAO Hanxiang %J 铁道科学与工程学报 %D 2016 %X 新建塔石岭铁路隧道上跨既有公路隧道,采用全断面爆破施工,为了确保既有公路隧道运营的安全,需要明确控制爆破开挖的安全施工距离。基于已有的岩体中爆破振动速度衰减理论模型,首先计算安全施工距离范围,为验证模型与参数的合理性,开展相应的有限元计算分析。计算结果得出了爆破距离与既有隧道衬砌拱顶振动速度的关系,据此可根据振动速度安全标准计算得到相应的爆破施工安全距离,从而为工程爆破设计提供科学依据。<br>Proposed Tashiling railway tunnel overpasses the established highway tunnel and is designed to adopt the whole section blasting construction. In order to ensure the safety of the existing highway tunnel operation, it is necessary to define the safety construction of controlled blasting excavation distance. Based on the existing theoretical model of blasting vibration velocity attenuation in rock mass, it was the first to calculate the safety construction of the project scope. Next, the corresponding finite element calculation and analysis were used to verify the rationality of the model and parameter. The results indicate the relationship between explosion distance and the vibration velocity of the tunnel vault lining. According to the safety standards of vibration velocity, the corresponding blasting construction safety distance can be obtained through calculation, so as to provide scientific basis for engineering blasting design %K 交叉隧道 %K 控制爆破 %K 安全距离< %K br> %K crossed tunnel %K control blasting %K safety distance %U http://www.jrse.cn/paper/paperView.aspx?id=paper_311935