%0 Journal Article %T Integration and Conventional Systems at STAR %A H. S. Matis %A R. L. Brown %A W. Christie %A W. R. Edwards %A R. Jared %A B. Minor %A P. Salz %J Physics %D 2002 %I arXiv %R 10.1016/S0168-9002(02)01977-0 %X At the beginning of the design and construction of the STAR Detector, the collaboration assigned a team of physicists and engineers the responsibility of coordinating the construction of the detector. This group managed the general space assignments for each sub-system and coordinated the assembly and planning for the detector. Furthermore, as this group was the only STAR group with the responsibility of looking at the system as a whole, the collaboration assigned it several tasks that spanned the different sub-detectors. These items included grounding, rack layout, cable distribution, electrical, power and water, and safety systems. This paper describes these systems and their performance. %U http://arxiv.org/abs/nucl-ex/0205008v1