%0 Journal Article %T Integrative Approach to the Plant Commissioning Process %A Kris Lawry %A Dirk John Pons %J Journal of Industrial Engineering %D 2013 %I Hindawi Publishing Corporation %R 10.1155/2013/572072 %X Commissioning is essential in plant-modification projects, yet tends to be ad hoc. The issue is not so much ignorance as lack of systematic approaches. This paper presents a structured model wherein commissioning is systematically integrated with risk management, project management, and production engineering. Three strategies for commissioning emerge, identified as direct, advanced, and parallel. Direct commissioning is the traditional approach of stopping the plant to insert the new unit. Advanced commissioning is the commissioning of the new unit prior to installation. Parallel commissioning is the commissioning of the new unit in its operating position, while the old unit is still operational. Results are reported for two plant case studies, showing that advanced and parallel commissioning can significantly reduce risk. The model presents a novel and more structured way of thinking about commissioning, allowing for a more critical examination of how to approach a particular project. 1. Introduction 1.1. Background Plant modifications are an ongoing process throughout the life of any process plant. Reasons for modification include efforts to improve reliability, production capacity, quality, or productivity. Seamless incorporation is the key concern associated with the installation of any new equipment in an operating plant due to the high cost of process downtime. Several steps can be taken to minimise the risk associated with the installation of new equipment such as hazard and operability studies, project management, development of redundancy plans, and commissioning of the new equipment. Of these, commissioning is an essential activity in many plant-modification projects and has significant implications for project success. Yet paradoxically it tends to be approached in an ad hoc manner. It is often included in project plans, so it is not that people are ignorant of commissioning. Rather, the problem is that there is a lack of systematic approaches to commissioning, so it is frequently left to tradespeople and plant operators to manage in whatever way they see fit. This is an undesirable situation since it results in unpredictable outcomes. In some cases it can even cause serious problems. An extreme example would be the catastrophic failure of the Chernobyl nuclear power plant (1986), which was caused by operators attempting an ad hoc test of the efficacy of a modified emergency cooling system. This paper presents a structured conceptual model for the commissioning process, and two cases studies showing application to operating plant. 2. %U http://www.hindawi.com/journals/jie/2013/572072/