%0 Journal Article %T Prioritization and selection of parameters for control chart implementation based on technical criticality and cost criticality %A Sirintra Tan-intara-art %A Napassavong Rojanarowan %J Decision Science Letters %D 2013 %I Growing Science %R 10.5267/j.dsl.2013.04.001 %X An important problem in control chart implementation is the availability of resources to collect and analyze data for control charts implementation. This paper proposes a method to prioritize and select final product parameters to control. The prioritization is based on cost of quality and technical criticality of those parameters. The prioritization method is demonstrated by a case study of flexible printed circuit manufacturing. %K Control charts %K Statistical process control %K Parameter prioritization %K Parameter selection %K Cost of quality %K Failure costs %U http://www.growingscience.com/dsl/Vol2/dsl_2013_17.pdf