%0 Journal Article %T DISE O CONCEPTUAL DE UNA ESTACI車N EXPERIMENTAL DE TRATAMIENTO DE AGUAS RESIDUALES DOM谷STICAS ORIENTADA A MUNICIPIOS CON POBLACI車N MENOR A 30.000 HABITANTES CONCEPTUAL DESIGN OF AN EXPERIMENTAL HOUSEHOLD WASTE WATER TREATMENT PLANT ADDRESSED TO MUNICIPALITIES WITH A POPULATION LOWER THAN 30,000 INHABITANTS %A Jos谷 Luis Gonz芍lez Manosalva %A Roberto Mej赤a Ruiz %A Francisco Molina P谷rez %J Revista Ingenier赤as Universidad de Medell赤n %D 2012 %I Universidad de Medell赤n %X Se presenta el dise o conceptual de una planta experimental de tratamiento de aguas residuales para poblaciones menores de 30.000 habitantes. El dise o integra seis esquemas de tratamiento interconectados, incluyendo sistemas convencionales y no convencionales, con disposici車n final del efluente a un cuerpo de agua o infiltraci車n lenta en el terreno, cumpliendo con la norma vigente en Colombia. El proceso incluy車 una revisi車n del estado del arte, el dise o de plantas de este tipo como la planta de Carri車n de los C谷spedes (Andaluc赤a-Espa a), la planta UFMG/COPASA (Minas Gerais-Brasil), los trabajos realizados en Colombia del IDEAM-CINARA-UTP y los ensayos realizados por Madera, Silva y Pe a del CINARA en planta piloto. El 芍rea estimada para la construcci車n de los esquemas propuestos es de 18.000 m2 y los costos fijos de construcci車n de la planta se estiman en 850 millones de pesos para tratar un caudal de 1,5 l/s de agua residual dom谷stica. Conceptual design of an experimental waste water treatment plant for populations lower than 30,000 inhabitants is presented. The design integrates six interconnected treatment systems, including conventional and non-conventional systems with final disposal of the effluent to a water body or slow infiltration in the soil, complying with Colombian norms in force. The process included a state-of-the-art revision, design of this kind of plants (such as Carri車n de los C谷spedes in Andaluc赤a, Spain; UFMG/COPASA plant in Minas Gerais-Brazil), works conducted in Colombia (IDEAM-CINARA-UTP), and tests performed by Madera, Silva, and Pe a from CINARA in a pilot plant. Area estimated for construction of systems proposed reaches 18,000 m2 and fixed costs for construction of the plant is estimated in 850 million Colombian pesos for treating a 1.5 l/s flow of household waste water. %K Aguas residuales dom谷sticas %K tecnolog赤a apropiada %K plantas de tratamiento de aguas residuales -PTAR- %K Household waste water %K proper technology %K waste water treatment plants %U http://www.scielo.org.co/scielo.php?script=sci_arttext&pid=S1692-33242012000200008