%0 Journal Article
%T Process Migration for the Network of Workstations
工作站网络系统进程迁移机制
%A PEI Dan
%A WANG Dong-sheng
%A SHEN Mei-ming
%A
裴丹
%A 汪东升
%A 沈美明
%J 软件学报
%D 1999
%I
%X Process migration is an important tool on NOWs (network of workstations) for load-balancing and high availability. In this paper, the authors present a log-based approach to provide process migration for parallel applications. Because this approach is implemented on top of PVM (parallel virtual machine), it is transparent to users and portable. This approach has been used in the ChaRM (checkpointing-based rollback recovery and process migration system) system. The experiments show that the overhead is low.
%K PVM
进程迁移
%K 工作站网络
%K 进程状态
%U http://www.alljournals.cn/get_abstract_url.aspx?pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=8240383F08CE46C8B05036380D75B607&jid=7735F413D429542E610B3D6AC0D5EC59&aid=F4ABAAD4B5F0167C&yid=B914830F5B1D1078&vid=F3090AE9B60B7ED1&iid=F3090AE9B60B7ED1&sid=31CCC5D591A72A74&eid=1F51A4E3D1D75885&journal_id=1000-9825&journal_name=软件学报&referenced_num=2&reference_num=8