%0 Journal Article
%T Reducing Plan Change: A Risk Driven Software Project Buffer Allocation Method
风险驱动的软件项目缓冲分配方法
%A XIE Li-Zi
%A WANG Qing
%A XIAO Jun-Chao
%A
谢利子
%A 王青
%A 肖俊超
%J 软件学报
%D 2010
%I
%X This paper proposes a risk driven project buffer allocation method which will allocate project buffer according to risks, schedule constrains and resource constrains between tasks. The result of simulation based experiments shows that compared with Critical Chain, the proposed method can remarkably reduce the frequency of plan change and minimize the negative impact to project duration. The method and the tool can help project managers to decide appropriate project buffer length and make better use of the limited buffer. The stability and trustworthiness of project plan schedule can be enhanced.
%K software project management
%K plan change
%K risk
%K project buffer
%K process simulation
%K resource constrain
软件项目管理
%K 计划变更
%K 风险
%K 缓冲分配
%K 过程模拟
%K 人力资源约束
%U http://www.alljournals.cn/get_abstract_url.aspx?pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=8240383F08CE46C8B05036380D75B607&jid=7735F413D429542E610B3D6AC0D5EC59&aid=B17B14E629DBF743A88E593F1C87DDEB&yid=140ECF96957D60B2&vid=659D3B06EBF534A7&iid=59906B3B2830C2C5&sid=8C9BD208C716E59D&eid=9C8EA42145B5801B&journal_id=1000-9825&journal_name=软件学报&referenced_num=0&reference_num=25