%0 Journal Article %T Ant colony algorithm for project scheduling problem under flexible work-hour constraints
柔性工时约束下项目调度及其蚁群算法 %A YING Ying %A SHOU Yong-yi %A
应瑛 %A 寿涌毅 %J 计算机应用 %D 2009 %I %X A new mathematical model for software engineering project scheduling was proposed. The model took into consideration the over-time of software engineers, which was regarded as a flexible work-hour constraint. The project human resources were analyzed in detail. As a type of special renewable resource, the human resource was added as a new constraint to the traditional resource constrained project scheduling problem. An ant colony algorithm based on parallel schedule generation scheme was suggested to solve this new flexible work-hour constrained project scheduling problem, and an instance was used to verify and analyze the solution. %K project scheduling %K work-hour constraint %K ant colony algorithm
项目调度 %K 工时约束 %K 蚁群算法 %U http://www.alljournals.cn/get_abstract_url.aspx?pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=8240383F08CE46C8B05036380D75B607&jid=831E194C147C78FAAFCC50BC7ADD1732&aid=17529CAD6BE50E1715FA2069868B762B&yid=DE12191FBD62783C&vid=771469D9D58C34FF&iid=B31275AF3241DB2D&sid=599BE0AAD31F648B&eid=E826542BD0A89666&journal_id=1001-9081&journal_name=计算机应用&referenced_num=0&reference_num=8