%0 Journal Article %T Multi-project scheduling problem with resource idle cost
考虑资源闲置成本的多项目调度问题研究 %A NI Lin %A ZHOU Lin %A JING Yi %A
倪 霖 %A 周 林 %A 景 熠 %J 计算机应用研究 %D 2013 %I %X By considering the idle resources cost in resources distribution process, this paper proposed a multi-objective coordination optimization model with the cost of multi-project duration daly and idle resources integrated synthetically, aiming at achieving integration scheduling optimization of resource-constrained multi-project. This model improved the efficiency of resource utilization, and achieved intergration scheduling in the case of minimal target cost in theory. Making comprehensive used of the advantage of simulated annealing algorithm and genetic algorithm, it designed an annealing genetic algorithm to solve the model. It carried a case study out to demonstrate the effectiveness of the proposed algorithm and model. %K 多项目调度 %K 资源约束 %K 闲置成本 %K 模拟退火 %K 遗传算法 %U http://www.alljournals.cn/get_abstract_url.aspx?pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=8240383F08CE46C8B05036380D75B607&jid=A9D9BE08CDC44144BE8B5685705D3AED&aid=51EFA6F8AD10024375F3B12CF468E61C&yid=FF7AA908D58E97FA&vid=340AC2BF8E7AB4FD&iid=CA4FD0336C81A37A&sid=BFE7933E5EEA150D&eid=E84BBBDDD74F497C&journal_id=1001-3695&journal_name=计算机应用研究&referenced_num=0&reference_num=13