%T Study on Work Breakdown Structure Model of Software Project
软件项目工作分解结构模型研究
%A XIONG Yao-hua
%A CHEN Chuan-bo
%A
熊耀华
%A 陈传波
%J 计算机应用研究
%D 2006
%I
%X Work Breakdown Structure(WBS) is a main technique to define the scope of project.Based on the software's(dua-)(lism:) process and product,and the software unusual distinguishing feature depart to the traditional project,the WBSR model is proposed in this paper,which integrates work breakdown structure,organization breakdown structure,product breakdown structure and the work responsibility in software project together.The work process of this model is put forward,and the effect to software project management of the WBSR model is analyzed at the same time.The model is realized in the software project management system of an international software enterprise successfully,which is useful to define the scope of software project and plan the project.
%K Software Engineering
%K Project Management
%K Work Breakdown Structure(WBS)
软件工程
%K 项目管理
%K 工作分解结构
%U http://www.alljournals.cn/get_abstract_url.aspx?pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=8240383F08CE46C8B05036380D75B607&jid=A9D9BE08CDC44144BE8B5685705D3AED&aid=7DAD6BFD8A782129&yid=37904DC365DD7266&vid=EA389574707BDED3&iid=5D311CA918CA9A03&sid=2A8D03AD8076A2E3&eid=659D3B06EBF534A7&journal_id=1001-3695&journal_name=计算机应用研究&referenced_num=3&reference_num=5