%0 Journal Article
%T Demonstration work of inter-cycle biological contact oxidation process for purification of Daqing River in Dianchi Lake watershed
附加回流的生物接触氧化工艺净化滇池大清河水质的示范工程研究
%A Zhang Hui Wen Donghui Li Lu Xie Shuguang
%A
张辉
%A 温东辉
%A 李璐
%A 谢曙光
%J 环境工程学报
%D 2009
%I
%X Daqing River is the most seriously polluted river in the Dianchi Lake watershed.A bypass demonstration work of the inter-cycle biological contact oxidation process(IBCOP),with the treatment scale of 1000 m3/d and the HRT of 4.75 h,was built around the river bank to purify the river water.During the winter dry season from Nov.2007 to Apr.2008,three sets of conditions of the demonstration work were operated by regulating cycling ratio based on the influent qualities and climatic conditions.The results showed ...
%K inter-cycle biological contact oxidation process (IBCOP)
%K river water
%K removal rate
%K demonstration work
%K Dianchi Lake watershed
附加回流生物接触氧化工艺(IBCOP)
%K 河道污水
%K 去除率
%K 示范工程
%K 滇池流域
%U http://www.alljournals.cn/get_abstract_url.aspx?pcid=3FF3ABA7486768130C3FF830376F43B398E0C97F0FF2DD53&cid=92E6F4267FD4CBCB51B1E49E014D8054&jid=3567BD61129AA59043F5DE01F8815DB5&aid=781F0C851E296CA3F13235F67762865B&yid=DE12191FBD62783C&vid=38B194292C032A66&iid=0B39A22176CE99FB&sid=FCD27DC5E1F2EEE7&eid=02DC3A182A5530DF&journal_id=1673-9108&journal_name=环境工程学报&referenced_num=1&reference_num=15