%0 Journal Article %T PRACTICE AND DECISION STUDY OF BUILDING SUPER-HIGH BENCH DUMPING-SITE
超高台阶排土场建设决策研究与实践 %A Cao Yang %A Li Jianghua %A Yan Ronggui %A Liu Wenyu %A Zheng Tai %A
曹阳 %A 黎剑华 %A 颜荣贵 %A 刘文钰 %A 郑太 %J 岩石力学与工程学报 %D 2002 %I %X It is an important measurement in decreasing mining-caused land destruction by building super-high bench dumping-site. Foundation loading,stability analysis,mud-rock-flow and water control are key factors in decision making. By the new study,a great scale dumping-site in Qijiagou of Changba,which is 400 m high has been built. Meanwhile,mechanism of foundation loading,technology of determining the limit height of dumping-site,corresponding stability analysis,and a new method of controlling mud-rock flow by controlling small and tiny grains have been developed. The first sluiceway of dumping-site has been built successfully in our country. Afterward,these techniques have been developed widely in Miaoergou dumping-site of Nanfen. Better effects have been obtained. Therefore,this technique can be used widely for reference in other mines. %K super-high bench dumping-site %K foundation loading %K stability analysis %K mud-rock flow %K sluiceway
超高台阶排土场 %K 基底承载 %K 泥石流 %K 底部泄流体 %U http://www.alljournals.cn/get_abstract_url.aspx?pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=D3421FAA1A0A0F0C&jid=35E747D791A1346351AFB523B7FA35CB&aid=B272BC6BA88231C8&yid=C3ACC247184A22C1&vid=659D3B06EBF534A7&iid=59906B3B2830C2C5&sid=094C3D568C8F29C3&eid=1A1522797E8D4D41&journal_id=1000-6915&journal_name=岩石力学与工程学报&referenced_num=6&reference_num=11