%0 Journal Article
%T STUDY OF DESIGN AND CONSTRUCTION PARAMETERS FOR UNDERGROUND RESERVOIR INTER-SEEPAGE DAM IN PEBBLE BED
卵砾石层中地下水库截渗坝设计与施工参数研究
%A Li Xiangran
%A Yao Zhixiang
%A Zhao Chunfu
%A Gao Mingjiu
%A
李相然
%A 姚志祥
%A 赵春富
%A 高明久
%J 岩石力学与工程学报
%D 2003
%I
%X The construction of underground reservoir has become a good measurement and basic method to solve the water supply in the world,and the key of this engineering is the construction of underground inter-seepage dam. The project of the underground reservoir in littoral zone of the Yantai City is taken as a case study. Based on the analysis of ground condition of hydrogeology and engineering geology,the design parameters of the underground reservoir inter-seepage dam in pebble bed are studied. Two new structure types of the underground reservoir inter-seepage dam in pebble bed are proposed. Their structure characteristics are also analyzed. The construction parameters and quality control of the inter-seepage dam in pebble bed are discussed. Finally,the impervious effects are tested and analyzed.
%K hydraulic structure
%K pebble bed
%K underground reservoir inter-seepage dam
%K design parameters
%K construction parameters
地下水库
%K 卵砾石层
%K 地下水资源
%K 截渗坝
%K 工程施工
%U http://www.alljournals.cn/get_abstract_url.aspx?pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=D3421FAA1A0A0F0C&jid=35E747D791A1346351AFB523B7FA35CB&aid=EE11CD02534A0B88&yid=D43C4A19B2EE3C0A&vid=BC12EA701C895178&iid=5D311CA918CA9A03&sid=37E1CFF130ACDBB2&eid=35D8C930A8A0D2C6&journal_id=1000-6915&journal_name=岩石力学与工程学报&referenced_num=1&reference_num=8