%0 Journal Article %T STABILITY MONITORING OF THE INNER SLOPE OF NO.2 TAILWATER CHANNEL IN THE ERTAN HYDROELECTRIC STATION
二滩水电站二号尾水渠内侧边坡稳定监测 %A Li Yandong %A
李燕东 %J 岩石力学与工程学报 %D 1998 %I %X During the excavation of the inner slope of No. 2 tailwater channel, some kinds of monitoring instruments were established and worked away for a long term about six years.The monitoring data for the inner slope stability was analyzed especially by the multipoint displacement gauge. The creep mechanism of slope and the effects of reinforcement by bolts were also discussed. %K rock monitoring in situ %K stability of slope
现场岩石监测 %K 边坡稳定 %U http://www.alljournals.cn/get_abstract_url.aspx?pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=D3421FAA1A0A0F0C&jid=35E747D791A1346351AFB523B7FA35CB&aid=EF7CCF464D490852AA230801B8F41D8F&yid=8CAA3A429E3EA654&vid=43608FD2E15CD61B&iid=B31275AF3241DB2D&sid=06DAE5E1DF7D0B6A&eid=B28C697BC3A1BA62&journal_id=1000-6915&journal_name=岩石力学与工程学报&referenced_num=8&reference_num=2