%0 Journal Article %T TUNNELING METHODS THROUGH RIVER(LAKE,SEA) BED UNDER SHALLOW COVERING BY SHIELD
盾构隧道穿越水底浅覆土施工技术对策 %A Zhang Qinghe %A Wang Shentang %A Yan Changzheng %A Zhang Wei %A
张庆贺 %A 王慎堂 %A 严长征 %A 张伟 %J 岩石力学与工程学报 %D 2004 %I %X By analyzing the equilibrium states of the tunneling face and the tunnel under water,the formulas about the balance between the water and soil pressure in front of working face and the pressure in the cabin given by shield is obtained. The smallest covering depth required by the safety of tunneling face and tunnel is given. Then,based on the Phrase One Project of Nanjing Metro North-South Line,some main methods dealing with the shallow underwater ground are provided. The effect of the presented methods is introduced. The obtained conclusion in this paper can be used to the tunnels through river bed and those under shallow covering by shield. %K tunneling engineering %K shield %K segment %K shallow covering %K anti-buoyancy board
隧道工程 %K 盾构 %K 管片 %K 浅覆土 %K 抗浮板 %K 土压平衡 %U http://www.alljournals.cn/get_abstract_url.aspx?pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=D3421FAA1A0A0F0C&jid=35E747D791A1346351AFB523B7FA35CB&aid=3BF565F4725D7BF0&yid=D0E58B75BFD8E51C&vid=EA389574707BDED3&iid=94C357A881DFC066&sid=E002FF26604EFFAB&eid=0B757E9DCA0EC579&journal_id=1000-6915&journal_name=岩石力学与工程学报&referenced_num=20&reference_num=5