%0 Journal Article
%T INFLUENCE OF CONSTRUCTION OF SHANGHAI STADIUM TRANSVERSE STATION OF PEARL LINE PHASE II ON STATION OF METRO LINE NO.1
明珠线二期上海体育馆地铁车站穿越施工对地铁一号线车站的影响
%A Kong Xiangpeng
%A Liu Guobin
%A Liao Shaoming
%A
孔祥鹏
%A 刘国彬
%A 廖少明
%J 岩石力学与工程学报
%D 2004
%I
%X With the development of urban metro,there will be more and more interchange connections. The construction of transverse station will influence the old stations structure inevitably,and cause the risk during the construction. The problem is analysed by three dimensional FEM,and the regular and valuable conclusions are drawn for the influence of construction of Shanghai stadium transverse station of pearl line phase II on the station of metro line No.1.
%K metro
%K interchange connection
%K transverse station
%K three dimensional FEM
地铁车站
%K 穿越施工
%K 三维有限元
%K 换乘节点
%U http://www.alljournals.cn/get_abstract_url.aspx?pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=D3421FAA1A0A0F0C&jid=35E747D791A1346351AFB523B7FA35CB&aid=61DD6915A6556C1B&yid=D0E58B75BFD8E51C&vid=EA389574707BDED3&iid=94C357A881DFC066&sid=08F83145FA367D52&eid=95780E43ADDDE2AA&journal_id=1000-6915&journal_name=岩石力学与工程学报&referenced_num=10&reference_num=4