%0 Journal Article
%T A STUDY ON DYNAMIC PROGRAMMING TO DETERMINATE NONCIRCULAR CRITICAL SLIP SURFACE OF SLOPES
边坡非圆临界滑面确定之动态规划法研究
%A Cao Wengui
%A Yan Ronggui
%A
曹文贵
%A 颜荣贵
%J 岩石力学与工程学报
%D 1995
%I
%X The determination of critical slip surface has been a key problem. The criticalslip surface is noncircular in general,whose determination has not been solved in theworld.This paper has successfully solved this problem and gives out the minimum safetyfactor based on Janbu's method with dynamic programming method.This method has taken the influences of underwater and earthquakes into consideration concerning slopes in thestability analysis of complex geological slopes,and it has obvious advantages comparedwith the similar methods in the world.The theory of determination for critical slip surfaceis improved with this paper.
%K slope
%K Janbu's method
%K dynamic programming
%K noncircular critical slip surface
边坡
%K 稳定性
%K 非圆临界滑面
%K 动态规划法
%U http://www.alljournals.cn/get_abstract_url.aspx?pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=D3421FAA1A0A0F0C&jid=35E747D791A1346351AFB523B7FA35CB&aid=7046B9DEEE69606328CA29731649B0CB&yid=BBCD5003575B2B5F&vid=F3583C8E78166B9E&iid=E158A972A605785F&sid=CA9ED1AB4D9E3E04&eid=A5B34D9E8FDA439A&journal_id=1000-6915&journal_name=岩石力学与工程学报&referenced_num=20&reference_num=5