%0 Journal Article %T ENGINEERING GEOLOGY PROBLEM OF KARST FOUNDATION WITH TUNNEL AND TREATMENT OF THE FOUNDAION
深埋隧洞中的岩溶地基工程地质问题及地基处理 %A Yu Bo %A
余波 %J 岩石力学与工程学报 %D 2001 %I %X Taking the karst foundation problem with 10 km long tunnel in Tianshengqiao No.2 Hydropower Station for an example, the geology condition, engineering geology problem and treatment method of the karst foundation are presented. %K tunnel %K karst %K foundation %K treatment
岩溶 %K 地基 %K 处理 %K 引水隧洞 %K 工程地质 %K 地基处理 %U http://www.alljournals.cn/get_abstract_url.aspx?pcid=5B3AB970F71A803DEACDC0559115BFCF0A068CD97DD29835&cid=D3421FAA1A0A0F0C&jid=35E747D791A1346351AFB523B7FA35CB&aid=DF0E04853D94C080&yid=14E7EF987E4155E6&vid=A04140E723CB732E&iid=38B194292C032A66&sid=1E9426A299DC9FFD&eid=8CCD0401CC9AE432&journal_id=1000-6915&journal_name=岩石力学与工程学报&referenced_num=10&reference_num=4