%0 Journal Article %T The Model of Ascertaining the Amount of Project Equipments Claims Based on the Contract Agreement Measuring
基于合同满意度的工程设备索赔额确定模型 %A LI Xiao-long %A FU Qiang %A WU Zhen-ye %A
李晓龙 %A 付强 %A 武振业 %J 系统工程理论与实践 %D 2003 %I %X Combining with the peculiarities of the claims of project equipments, firstly, this paper gives the concepts of the worthiness of project equipment, the project equipment contract depreciation and the project equipment contract agreement measuring. After analyzing the seed of affecting the project equipment worthiness, we offered the systemic analyzing method of finding affairs of the project equipments contract claims. Finally, the paper gives the model of ascertaining the amount of project equipments claims which based on the contract agreement measuring, and a case is successfully explained. %K project equipment %K claims %K the worthiness of project equipment %K contract agreement measuring
工程设备 %K 索赔 %K 合同满意度 %U http://www.alljournals.cn/get_abstract_url.aspx?pcid=01BA20E8BA813E1908F3698710BBFEFEE816345F465FEBA5&cid=962324E222C1AC1D&jid=1D057D9E7CAD6BEE9FA97306E08E48D3&aid=95AA6A0C568C9B16&yid=D43C4A19B2EE3C0A&vid=EA389574707BDED3&iid=B31275AF3241DB2D&sid=331211A5F5616413&eid=F24949CFDB502409&journal_id=1000-6788&journal_name=系统工程理论与实践&referenced_num=0&reference_num=6