%0 Journal Article
%T An Integer Programme Algorithm for Additional Resource Optimization
项目附加资源优化的整数规划算法
%A LU Huimin
%A
陆惠民
%J 系统工程理论与实践
%D 1999
%I
%X According to the time parameter analysis of critical path method (CPM), a mix integer programme model of additional resources in project construction has been presented. On the basis of the model, we can not only obtain a schedule of using additional leased equipment and additional resources but also gain the lowest disbursement under the fully utilization of ready made resources.
%K additional resources
%K mix integer programme
%K critical path method (CPM)
%K optimization
附加资源
%K 混合整数规划
%K 关键线路法
%K 寻优
%U http://www.alljournals.cn/get_abstract_url.aspx?pcid=01BA20E8BA813E1908F3698710BBFEFEE816345F465FEBA5&cid=962324E222C1AC1D&jid=1D057D9E7CAD6BEE9FA97306E08E48D3&aid=B584FDC05F225791&yid=B914830F5B1D1078&vid=2A8D03AD8076A2E3&iid=5D311CA918CA9A03&sid=E203FB1A272C9DD2&eid=CD775AE9DDBD7B53&journal_id=1000-6788&journal_name=系统工程理论与实践&referenced_num=2&reference_num=0