%0 Journal Article
%T A Cost Model of Air Defence Missile Weapon Based on the Equalation-Engineering-Value-Rate
基于等工程价值比的防空导弹武器费用模型
%A ZHAO Ying-jun
%A
赵英俊
%J 系统工程理论与实践
%D 2001
%I
%X In this paper, the concept of equalation-engineering-value-rate has been advanced for different countries and cost model for internal type which is based on foreign countries (the United States of America) has been established. It overcomed shortcoming for internal data and studied on cost model of Air Defence Missile Weapon tending to practice.
%K equalation-engineering-value-rate
%K parameter model
等工程价值比
%K 参数模型
%K 费用
%U http://www.alljournals.cn/get_abstract_url.aspx?pcid=01BA20E8BA813E1908F3698710BBFEFEE816345F465FEBA5&cid=962324E222C1AC1D&jid=1D057D9E7CAD6BEE9FA97306E08E48D3&aid=395E2B44B3CF19F0&yid=14E7EF987E4155E6&vid=659D3B06EBF534A7&iid=B31275AF3241DB2D&sid=6700D0D256586E73&eid=A4FA325EA800C820&journal_id=1000-6788&journal_name=系统工程理论与实践&referenced_num=0&reference_num=3