%0 Journal Article %T Feasibility Study to Install Wind Farm in Bab Al-Hawa, Irbid, Northwest of Jordan %A Mohammad Al-Smairan %A Omar Al-Nhoud %J Modern Mechanical Engineering %P 30-48 %@ 2164-0181 %D 2019 %I Scientific Research Publishing %R 10.4236/mme.2019.91004 %X The utilization of wind energy for power generation purposes is becoming increasingly attractive and gaining a great share in the electrical power production market worldwide. This research was considered a feasibility study of wind energy farm in Bab Al-Hawa, Irbid. The average wind speed in the site is (6.5 m/s). Data have been collected, which includes the average monthly wind speed for 10 years, but by HOMER software to create the hourly wind speed of a representative year is created in order to build Weibull distribution and to calculate the energy generated output of the project. This project contains the construction of 33 wind turbines in 3.11 km square. Each turbine has a capacity of 900 kW rated power and the total rated capacity is 29.7 MW. The capacity factor was found equal to 37.1% which means the amount of utilization of the turbine capacity. The results show that the turbines work 87,286 h/yr, and the total energy generated is 96.548559 GWh/yr. from the 33 wind turbines installed. The initial cost of this project is equal to 80.5243 M$ and the Payback period is 7 years. We have taken into account the environmental impact such as CO2 emissions into consideration. CO2 reductions by using wind energy instead of %K Wind Farm %K Bab Al-Hawa %K HOMER Software %K Energy %K Capacity Factor %U http://www.scirp.org/journal/PaperInformation.aspx?PaperID=90774