%0 Journal Article %T Flexible-resource Constrained Project Scheduling Research Based on Particle Swarm Optimization
粒子群优化算法在柔性资源受限项目调度中的研究 %A 陈君兰 %A 叶春明 %J 计算机科学 %D 2013 %I %X In order to better solve the flexiblcrcsource constrained project scheduling problem, matrix with proficiency was established to show the relations between resources and skills, and CPSO (Chaos Particle Swarm Optimization) was used in this essay to solve this problem. In consideration of work's priorities and flexiblcresource constrained problem, a randomized priority chain was formed and followed by an optimized result based on Serial Schedule Generation Scheme (SSGS) and the best schedule of the whole project was found by updating the population by CPSO. Results prove the possibility and effect of this method in solving this problem. Therefore, this method has its practical application value for the flexiblcresource constrained project scheduling problem. %K 柔性资源,粒子群,项目调度,串行进度生成机制,混沌 %U http://www.alljournals.cn/get_abstract_url.aspx?pcid=5b3ab970f71a803deacdc0559115bfcf0a068cd97dd29835&cid=8240383f08ce46c8b05036380d75b607&jid=64a12d73428c8b8dbfb978d04dfeb3c1&aid=d8cf0d2a1d9d336124e4de465aab45a6&yid=ff7aa908d58e97fa&vid=1371f55da51b6e64&iid=0b39a22176ce99fb&sid=6a73b36e85db0ce9&eid=ca7af28f8314cfec&journal_id=1002-137x&journal_name=计算机科学&referenced_num=0&reference_num=0