The working time of a
single mine surveyor or the working time of a whole “Mine Surveying Ergatic
System” (MSES) depends on various factors. These factors are: different
qualities of a surveyor as a professional and a person, his emotion and
attention, accuracy and comfort of mine surveying instruments, and the mine working environment.
These factors make it possible to conclude the MSES working time to be a stochastic
quality. In our research, a unimodal alpha-distribution was used. We
have studied the working time of 1 type of MSES: “measurements of horizontal angle”.
More than 80 mine surveyors and students have taken part in the experiments.
The alpha-graphic
line shows an accurate interpretation of different points, so it may be used in
testing mine surveyors’ professional skills.
Cite this paper
Zverevich, V. V. , Tsaplev, V. M. , Zhukov, G. P. and Ivanova, A. L. (2016). Theoretical and Experimental Study of Mine Surveyors Testing. Open Access Library Journal, 3, e3020. doi: http://dx.doi.org/10.4236/oalib.1103020.
Zverevich, V.V.,
Vakhnin, N.A.
and Vakhnina, E.G.
(2009) Three
Principles and Three Constituents of the Mine Surveying Ergonomics. Economy of Komy Republic, 18, 279-282.
Zverevich, V.V. and
Tsaplev, V.M. (2015) A
Mathematical Model of Mine Surveying Work Time. American Journal of Environmental Engineering and Science,2, 60-64.
Zverevich, V.V. and
Pandul,
I.S. (2011) Fatigability
Evaluation of the Mine Surveyor under the Earth. In: Industrial Exploitation of the North Mineral Resources. Problems and Solutions, Proceedings of the 9th International Scientific and Practical Conference, Vol. 2, Vorkuta
Mining College,
The Branch of the National Mineral Resources University (Gorny),
Vorkuta, 360-363.
Zverevich, V.V. (2013) Mine
Surveyor Working Place Arrangement. In: Industrial Exploitation of the North Mineral
Resources. Problems and Solutions. 11th International Scientific and Practical
Conference, Vorkuta Mining College, The Branch of the National
Mineral Resources University (Gorny), Vorkuta, 286-288.
Zverevich, V.V. and
Tsaplev,
V.M. (2013) The
Influence of the Noise on Mine Surveyor. In: Drebenstedt,
C.
and Singha,l R., Eds., Mine Planning and Equipment Section, Proceedings of 22nd MPES Conference, Dresden, 14-19
October 2013, Vol. 1,
659-664.
Zverevich, V.V. and
Tsaplev, V.M. (2015) Fractal
Method of Evaluation of the Effect of Noise on the Workers in the Mine. Proceedings of the Vth International Conference, Protection from the High Noise and Vibration,
Saint-Petersburg, March 2015, 694-700.
Zverevich,
V.V. and Slyunin,
K.Yu. (2009) Innovation
in Supporting of Strip-Mining. In: Industrial
Exploitation of the North Mineral Resources. Problems and Solutions. Proceedings
of the 7th International Scientific
and Practical Conference, Vol. 1, Vorkuta Mining College,
The Branch of the National Mineral Resources University (Gorny),
Vorkuta, 71-73.
Zverevich, V.V. and Tsaplev, V.M. (2013) Noise
and the Work Time of Mine Surveyor under the Earth. Proceedings of the IVth
Russian—International Scientific-Practical Conference: Protection from the Noise and Vibration, Saint-Petersburg,
26-28
March 2013, 646 – 651.
Johnson,
N.J. and Leone,
F.C. (1977) Statistics
and Experimental Design in Engineering and Physical Sciences, Vol. 1. 2nd
Edition,
John Wiley and Sons, New York.
Krylov, V.N. (1975) Determination
of Alpha-Distribution Maximum Probable Values of Systems Running Faultlessly
Till Refusal. Proceedings of Moscow Institute of Railway
Transport Engineers, Vol. 503, 43-50.
Zverevich, V.V.,
Novikova, E.I. and
Plotnikova,
Yu.V. (2004)
Ergonomic Evaluation of Mine Surveyor’s Tools. Proceedings of the Mining Institute, Vol. 156, 167-170.