全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

Corad Agile Method for Agile Software Cost Estimation

DOI: 10.4236/oalib.1100579, PP. 1-13

Subject Areas: Applications of Communication Systems, Network Modeling and Simulation

Keywords: Agile Methods (DSDM, ASD, SCRUM, AUP), COCOMO-II Extension CORADMO Method, COCOMO-II Scale Factors

Full-Text   Cite this paper   Add to My Lib

Abstract

In this paper we are introducing new method of software cost estimation for Agile based software projects (Web based agile projects) and also like to introduce how this method is improving performance and efficiency of Agile based Software cost estimation. Rapid application development model CORADMO provided cost estimation in the form of rapid person productivity count by using person-month (Effort) and month (Schedule), but CORADMO followed waterfall model, so in agile case we do not require waterfall model fully and in agile software development all the stage of development having rapidly change with customer requirements, and COCOMO-II have no longer support for this, we needed a new method to improve rapid cost estimation performances, and also relate with agile methodology and provide more matching relation with agile methods: DSDM, ASD, AUP and SCRUM.

Cite this paper

Rajput, G. S. and Litoriya, R. (2014). Corad Agile Method for Agile Software Cost Estimation. Open Access Library Journal, 1, e579. doi: http://dx.doi.org/10.4236/oalib.1100579.

References

[1]  Cowan, S., Watson, P. and Cowan, S. (2011) An Agile Cost Estimating Methodology for Aerospace Procurement Operations: Genetic Causal Cost CENTRE-ing.
www.intechopen.com
[2]  Winsor Brown, A. (2002) Cyrus Fakharzadeh, CORADMO Extensions of COCOMO II.
[3]  Boehm, B., Chulani, S. and Eyed, A. (1997) Knowledge Summary: USC-CSE Focused Workshop on Rapid Application Development. USC-CSE Technical Report.
[4]  Boehm, B.W. (1981) Schedule Estimation Questionnaire. Prentice-Hall, Englewood Cliffs.
[5]  Scale Factor Description with COCOMO-II.
http://en.wikipedia.org/wiki/Scale_factor
[6]  Khan Zia, Z., Kamal Tipu, S. and Khan Zia, S. (2012) An Effort Estimation Model for Agile Software Development.
www.worldsciencepublisher.org
[7]  Abbas, S.A., Liao, X.F., Ur Rehman, A., Azam, A. and Abdullah, M.I. (2012) Cost Estimation: A Survey of Well- Known Historic Cost Estimation Techniques. Journal of Emerging Trends in Computing and Information Sciences, 3, 612-636.
http://www.cisjournal.org
[8]  Lang, M., Conboy, K. and Keaveney, S. (2012) Cost Estimation in Agile Software Development Projects.
http://agilemanifesto.org/history.html
[9]  Barbosa, C.M., Loubach, D.S. and Marques, A. (2010) An Estimation Model to Measure Computer Systems Development Based on Hardware and Software.
http://mdp.ivv.nasa.gov
[10]  Clark, B., Devnani-Chulani, S. and Boehm, B. (1998) Calibrating the COCOMO II Post-Architecture Model.
http://sunset.usc.edu/Research_Group/Sunita/down/calpap.pdf
[11]  Talby, D. and Dubinsky, Y. (2005) Governance of an Agile Software Project.
http://domino.research.ibm.com/library/cyberdig.nsf/
[12]  Attarzadeh, I. and Hock Ow, S. (2009) Software Development Effort Estimation Based on a New Fuzzy Logic Model. International Journal of Computer Theory and Engineering, 1, 1793-8201.

Full-Text


comments powered by Disqus

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133

WeChat 1538708413